UPON following up inspection of the Hospital Queen Elizabeth 2 (QEH2) yesterday by SAPP Youth Leaders Simon Chin and Jeffery George, workers were still found working by doing repair works at the car park at level 3 & level 4.

Looking at the condition of the car park, Simon wonder how QEH2 can be taken over and be fully operational in August, as again, quoted by the Health department Director, Dr Mohd. Yusof Haji Ismail today.

Simon again queried if the OC was certified Fit by a professional in accordance with Uniform Building Bylaws (UBB) and Standard Practices Malaysia.

“We now also understand that public building like hospital, have stricter UBB to be applied. Shouldn’t the Architect engage a ‘coring test’ on the structure concrete or floor with defeats and also have the Structure Consulting Reports” emphasized Simon.

“We do not want a repeat of the Tower Block at Hospital Queen Elizabeth 1(QEH1), which is now demolished because it was not safe anymore. The Tower Block did not live a normal ‘Life Span’ of 50 years for a normal building.

We quite worried because this is “Another Barisan National Government Project” by West Malaysia Company.

By : SAPP MEDIA (sabahkini)

19 comments:
Write comments
  1. Are Sabahans not capable to do it?

    ReplyDelete
  2. utamakan kontraktor tempatan.

    ReplyDelete
  3. Don't simply give OC if the building construction doesn't fulfill the safety requirements.

    ReplyDelete
  4. Harap tempat letak kereta tersebut dapat dibaiki sebelum digunakan.

    ReplyDelete
  5. DBKK jangan bagi OC jika projek tidak memenuhi syarat.

    ReplyDelete
  6. sebaiknya jika kontraktor tempatan diberikkan keutamaan.

    ReplyDelete
  7. bangunan sepatutnya dibina dengan berkualiti dan mencapai standard keselamatan sebab ia bukan diguna untuk satu atau dua tahun saja.

    ReplyDelete
  8. Semoga projek ini terlaksana sehingga siap dan tidak akan terbangkalai.

    ReplyDelete
  9. Banyak betul masalah yang timbul. Menyedihakn betul oo.

    ReplyDelete
  10. Harap hal ini dapat diberi perhatian dan pastikan ia tak berulang lagi.

    ReplyDelete
  11. Sabah's project should b awarded to Sabahan

    ReplyDelete
  12. Why? No local contractor are eligible to build the hospital?

    ReplyDelete
  13. The claim to be no land to build a new bospital, but as we seen the multilevel QEH car park, i wonder why they just build a car park there instead of a hospital building with car park.

    ReplyDelete
  14. As long as they are good contractor, doesn't matter where he come from.

    ReplyDelete
  15. The buildings life span are too short, wasted peoples money.

    ReplyDelete
  16. Sabag base company should request more project from West Malaysia. To be fair and i believe Sabah base company have same strength as their counterpart from West.

    ReplyDelete
  17. Longer the project delay, more suffer for the patients.

    ReplyDelete
  18. next time any leaders from opposition parties should not insist the government to implement and complete the project quickly.

    ReplyDelete
  19. Sesiapa yang berkalibar dan berbakat melaksanakan projek tersebut dengan sempurna tanpa mengalami sebarang risiko tinggi sepatutnya diberi keutamaan. Contractor manakah yang patut dipilih? Siapa yang memilihnya? Kesemua ini perlu dikaji dengan teliti danbukan sewenang-wenangnya.

    ReplyDelete

Note: Only a member of this blog may post a comment.